Blown Away: Counting the Colossal Cost of Cleaning Up ‘Clean’ Energy’s Monstrous Mess

STOP THESE THINGS

Giant industrial wind turbines have an economic lifespan around 15 years, after which the chances are that they’ll be left to rust in some idiot’s back paddock.

Decommissioning these things properly at a sizeable wind farm would run into the hundreds of millions. Then there’s the toxic waste.

Already, thousands of 45-70m blades are being ground up and mixed with concrete used in the bases of other turbines erected later or simply dumped in landfill. Which should worry locals: the plastics in the blades are highly toxic, and contain Bisphenol A, which is so dangerous to health that the European Union and Canada have banned it.

Following that theme, Tony Thomas takes us on a tour of our wonderful wind powered future.

Inherit the Wind
Quadrant Online
Tony Thomas
7 November 2019

It’s good to know that wind turbine blades are a bird’s best friend, or something like…

View original post 2,093 more words

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s